How VR Goalkeeper Works
Simulator vratarskih situacija reproducira šuteve iz različitih kuteva i bilježi ključne metrike za analizu.
Setup
VR headset with 4 trackers + 3 × 4 m space
Simulation
Training modes: Regular, Penalties, Warm-up, and Shootout
Measurements
Measures training duration and save success rate
Analytics
Overall and daily training statistics. Visual progress and performance charts.
How the VR system looks in practice
Real views of the virtual field, training statistics, and analytics.
Virtual field in the sports hall
Progress charts – trends over time.
Daily statistics – totals per day and comparisons.
Player profiles – player data
Why VR training?
- Safety without contact.
- High volume of repetitions.
- Control of difficulty and patterns.
- Measurability of every attempt.
Equipment
HTC Vive Pro 2 set, 4 Vive trackers, a laptop, and 3 × 4 m of space